choosing-the-right-fair 12 min read Updated 22 Nov 2026

Exhibiting at SPS Nuremberg 2026 - Industrial Automation Stand Cost, Venue and Operations Guide

SPS Nuremberg 2026 guide: industrial-automation stand cost at NurnbergMesse, live-demo power and rigging, venue operations, and builder selection.

ES Exhibition Stands EU EditorialEditorial standards ↗
Fair Participation illustration

SPS (Smart Production Solutions) is the anchor event of the European industrial automation calendar. For exhibitors in control technology, drives, sensors, industrial communication and manufacturing software, it is the single most important selling window of the year.

Exhibiting at SPS costs what this guide spells out and the Nuremberg hall layout and how it shapes stand design appear here too. Operational decisions that separate a smooth build from an expensive one get covered as well. The 2026 show takes place from 24 to 26 November 2026 at Nuremberg exhibition centre and is run by Mesago Messe Frankfurt. More than 1,000 exhibitors come together there in front of over 50,000 specialist visitors.

Why SPS is a different exhibiting problem

Most trade fairs ask an exhibitor to attract attention. SPS asks something harder: it asks a control-cabinet builder, a drive manufacturer or an industrial-software vendor to demonstrate working technology to an audience of engineers who came specifically to evaluate it. The visitor profile at SPS is unusually technical and unusually decisive.

These are automation specialists, machine builders, system integrators and plant engineers with live procurement questions, and they judge a stand on whether the demonstration in front of them answers those questions.

The brief shifts as a result since SPS stand design moves closer to a functioning demo environment over a branded space. Powered demo benches, operational PLCs and drives, screens displaying live process information and adequate quiet meeting space for moving a qualified engineer from display to technical discussion are required.

Function drives the design as the build handles real electrical load, cable management for equipment and most often network infrastructure.

Industry perspective: At an automation show, the stand is the proof. Engineers don’t want a rendering of your controller running a line, they want to see it running a line. That single expectation drives most of the cost and most of the layout decisions.

Because the audience is time-pressured and specialist, wayfinding and the speed with which a visitor can reach the right demonstration and the right person matter more than spectacle. The most effective SPS stands are legible from the aisle, clear about which technology sits where and staffed by people who can talk at the depth the audience expects.

SPS has run in Nuremberg since 1990, and over three decades it has become the reference point for the European automation industry’s annual cycle. Formerly known as SPS IPC Drives, the fair rebranded to Smart Production Solutions to reflect how the sector has shifted from discrete components toward integrated, digital and networked automation.

Exhibitors need to take note of that shift. Today the modern SPS visitor wants to see not just a controller or a drive by itself but how they connect, how they exchange data and how they fit into a digitalised production line. A stand that shows a component without showing its place in a connected system answers last decade’s question.

The categories on display run from control technology, electric drive systems and sensors through to industrial communication, human-machine interfaces and software and IT for manufacturing. An exhibitor’s position within that spectrum shapes both where in the halls the stand belongs and what the demonstration needs to prove.

A sensor manufacturer and an industrial-software vendor are exhibiting at the same fair but solving very different demonstration problems, and the stand design has to follow from that.

The venue: how the Nuremberg halls affect your stand

The Nuremberg exhibition centre hosts SPS, one of Germany’s top fairgrounds. There are about 180,000 square metres of gross exhibition space spread across 16 halls. Two of those halls, 3A and 3C, came from a design by Zaha Hadid Architects. They hold DGNB Platinum sustainability certification and they are among the most energy-efficient exhibition halls anywhere.

Exhibitors need to grasp the venue’s scale, its managed hall and dock schedule and standard German technical rules on floor loading, power provisioning and rigging. Details on the hall layout, forwarder arrangements and access appear in our NürnbergMesse venue guide.

Following the logic of the automation supply chain, major control and drive makers anchor the biggest halls at SPS and how a stand sits relative to those anchors makes a difference to footfall. Hall placement and technical requirements get confirmed by exhibitors far in advance because SPS fills up the grounds and demonstration-heavy stands require power and services to be set up before build-up. At a venue this size, late electrical or rigging requests are where budgets slip.

At the same venue earlier in the year, Nuremberg also holds Embedded World, the top fair for embedded systems. Firms that exhibit at both events can bring back venue knowledge, approved-contractor links and even stand parts from one show to the other. That gives companies selling into both embedded and automation markets a real efficiency and our Embedded World fair guide goes along with this one for that reason.

What an SPS stand costs in 2026

The same per-square-metre logic applies to stand build at SPS as at other major German fairs. Yet the technical nature of automation drives most exhibitors up to the mid and upper tiers instead of down to the entry level.

The figures below reflect the European per-square-metre benchmark we maintain across contractors, expressed as the all-in build cost for the stand itself, before space rental, and are consistent with the ranges in our Europe per-sqm stand cost matrix.

Stand tier Typical use at SPS Indicative build cost (EUR per sqm)
Entry modular Small system integrators, first-time exhibitors 350 to 600
Standard custom Established component vendors, demo-led stands 600 to 1,100
Premium custom Major drive and control manufacturers, multi-storey 1,100 to 2,000+

These figures cover building only. Several more line items have to be added by an exhibitor budgeting for SPS and automation stands bring heavier versions of some of them than a typical consumer-facing fair does.

Line item What drives it at SPS
Space rental Charged per sqm by the organiser; premium hall positions cost more
Electrical supply Higher than average because demonstration equipment runs continuously
Rigging and hanging signs Structural sign-off required above set heights
Freight and forwarding Sensitive automation hardware, often palletised and insured
Stand services Water, compressed air and data where demonstrations require them
Staffing and travel Technical staff who can hold engineering conversations

Power is underestimated more than any other budgeting error at SPS. A stand that runs multiple live automation demos pulls in far more power than one that shows static products of the same size. Site orders for last-minute electrical upgrades are among the costliest changes an exhibitor can make and the solution is to put in the real electrical load during design, not during build-up.

Industry perspective: The exhibitors who control cost at SPS are the ones who treat the electrical and services plan as part of the stand design from day one. The ones who treat it as an afterthought pay for that decision twice, once in rushed on-site orders and once in downtime when a demo trips the supply.

Exhibitors considering whether the return justifies the investment face the same discipline as any major fair. Model cost per qualified conversation instead of the stand price that headlines the brochure. Our exhibition budget allocation framework gives a guide to how to budget that way.

Modular, custom, or a hybrid

At SPS, how often a company shows up and how much its demo changes between shows drive the decision on what stand type to use. When a vendor goes to SPS, Hannover Messe and one or two regional automation events each year, there is a strong case for a reusable modular or hybrid stand that can be reconfigured. Savings add up across the whole calendar and yet for some companies SPS comes around as a major appearance once a year and more brand value may come from a custom build.

As a reusable structural system that carries custom demonstration areas and branding, hybrid construction works well for automation stand design. Custom demonstration benches and technical infrastructure are the expensive, stable elements here and what changes is the surrounding presentation.

Our modular versus custom decision guide goes through the total-cost comparison across a whole multi-fair season.

Whichever route an exhibitor takes, the builder’s experience with the Nuremberg venue matters. A contractor who knows the halls, the approved-contractor rules and the load-in schedule reduces on-site risk during one of the busier weeks in the German autumn calendar. Exhibitors sourcing a builder for Nuremberg can start from our directory of European stand builders, several of whom hold documented experience at NürnbergMesse fairs.

The operational timeline

Stand design and contracting through the summer and early autumn get set up by the fact that SPS runs in late November. Counting down realistically for a mid-sized custom stand goes about like this.

  • Nine to twelve months out: confirm space, agree budget, brief the stand builder.
  • Six months out: lock stand design, confirm the true electrical and services load, book freight.
  • Three months out: finalise graphics, demonstration content and staffing, confirm hall logistics.
  • Build-up week. All live demos should be installed on the venue schedule, commissioned and tested before doors open.

Of all steps, the one most often compressed is demonstration-testing and it has the biggest effect on how the stand performs. A live automation demo that fails on the first morning is worse than no demo at all because the audience is exactly the one that will notice. Building in a full commissioning and test window before the fair opens is mandatory at a show like this.

Our stand-build timeline guide sets out the countdown in more detail.

Freight, customs and the automation-hardware problem

Automation exhibits bring up a freight question that consumer-goods displays do not most often run into, because the equipment is valuable, sometimes delicate and frequently crosses borders. Exhibitors coming to Nuremberg from outside the customs union have to plan temporary import properly. There are real cost and risk effects in choosing between an ATA Carnet, DDP shipping and formal temporary import.

Details of the per-country fees appear in our ATA Carnet cost guide. Our customs decision matrix goes through what route fits what shipment.

Treat freight timing as tightly as demonstration testing is the practical rule for SPS and sensitive automation hardware that comes in late or clears customs late gives no margin to commission before doors open. This size of fair does not let the venue’s dock schedule bend for any single exhibitor.

Staffing a technical stand

The staffing decision at SPS is where many otherwise well-built stands underperform. At a consumer fair, a personable team that can qualify and route visitors is enough. At SPS, the visitor who stops at a drive-systems stand often knows the product category in depth and arrives with a specific technical question. A stand staffed only by sales or marketing people, however capable, cannot hold that conversation and the visitor moves on to a competitor who can.

To get practical results, put real technical people on the stand. That means application engineers, product specialists or systems people who can go through the demo at the depth the audience expects and commercial staff who take care of qualification and follow-up.

These are expensive people to take out of the business for a week but it is the difference between a stand that generates qualified engineering conversations and one that generates business cards. This raises the travel and staffing line of the budget.

Industry perspective: You can build the best automation stand at the show, but if the person standing next to the demonstration cannot answer the second technical question, the stand has failed. The staffing plan is part of the stand design, not a separate decision made later.

Open display by itself does not bring about the kind of conversation that an automation sale needs. The choice of staff defines what goes into the stand design. A stand that calls for lots of technical talk needs enough seating for engineers and specialists to meet clients and that means semi-private spaces where they can work with laptops or controllers.

Our stand staffing guide works through the ratio of technical to commercial staff and how to brief them.

Measuring whether SPS paid back

The temptation is to measure SPS by visitor count or badge scans because SPS is expensive and technical. That is the wrong metric for this audience. A drive manufacturer that has twenty deep conversations with qualified machine builders has had a better fair than one that scanned five hundred badges of students and passers-by.

Engineering conversations entering the sales pipeline at SPS matter most for measurement so the eventual value of the projects those conversations became also gets measured.

Capturing not only contact details but also the substance of each qualified conversation that technology the visitor was evaluating. For which application as well as on what timeline calls for recording that argument. Follow-up can then be genuinely useful instead of generic and a lead-capture system that captures only names misses the most valuable thing a technical fair generates.

Our lead-capture systems comparison covers the tools that support this, and our wider exhibition strategy guides cover the attribution method.

Sustainability and the reusable-stand question

More and more industrial exhibitors have internal sustainability rules that extend into how they exhibit. The Nuremberg venue shows where the sector is going through its own credentials, which include the DGNB Platinum halls. Stand reuse most often gives an automation company its biggest sustainability benefit from exhibiting.

A custom stand built, shown once and scrapped carries a high embodied-carbon and financial cost, a reusable system amortised across SPS, Hannover Messe and regional shows carries far less of both.

The demonstration infrastructure that makes SPS stands expensive, the benches, the powered display areas, the technical fit-out, is also the part most amenable to reuse. It changes little between shows even as the surrounding branding is refreshed.

Companies running a multi-fair automation calendar therefore have a clear chance to cut both cost and environmental impact at the same time by standardising a reusable core and changing only the presentation layer.

This is one of the few places in exhibiting where the sustainable choice. The economical choice point the same way, and automation exhibitors who attend several shows a year are well positioned to take it.

The bottom line for SPS exhibitors

The stand becomes a working demonstration space for specialists who will decide then. There, cost drives as much from electrical load, services and freight as from what visitors see. SPS works best for exhibitors treating it like an engineering project instead of a marketing one.

Exhibitors that do well set out the real technical requirement early, work with a builder who knows the Nuremberg venue and safeguard the commissioning window until doors open. When those three things are right, SPS is one of the highest-return weeks on the European automation calendar. When they are wrong, the same week turns into an expensive lesson on why automation stands differ.

Those who plan their wider German-market fair strategy can put SPS up against the other major industrial shows in our fair-participation guides. Companies that are ready to buy a stand can start by looking at the verified builder directory.

FAQFrequently asked questions

The 2026 edition of SPS runs 24 to 26 November 2026 at the Nuremberg exhibition centre, organised by Mesago Messe Frankfurt. It gathers more than 1,000 exhibitors in front of over 50,000 specialist visitors. The fair has run in Nuremberg since 1990 and was formerly known as SPS IPC Drives before rebranding to Smart Production Solutions.

Entry modular builds run EUR 350 to 600 per sqm, suiting small system integrators and first-time exhibitors. Standard custom runs EUR 600 to 1,100 per sqm for established component vendors and demo-led stands. Premium custom for major drive and control manufacturers starts at EUR 1,100 per sqm and rises above 2,000. Those are build figures only, before space rental.

Space rental charged per sqm with premium hall positions costing more, electrical supply running higher than average because demonstration equipment runs continuously, rigging and hanging signs needing structural sign-off above set heights, freight and forwarding for sensitive palletised automation hardware, stand services such as water, compressed air and data, and technical staffing and travel.

Underestimating power. A stand running multiple live automation demonstrations draws far more than a stand of the same size showing static products, and last-minute electrical upgrades ordered on site are among the most expensive changes possible. The fix is specifying the true electrical load during design rather than during build-up, treating the services plan as part of the stand design.

The audience is automation specialists, machine builders, system integrators and plant engineers arriving with live procurement questions, and they judge a stand on whether the demonstration answers those questions. The brief moves closer to a functioning demo environment than a branded space: powered demo benches, operational PLCs and drives, screens showing live process information and quiet meeting space.

The Nuremberg exhibition centre offers around 180,000 square metres of gross exhibition space across 16 halls, with halls 3A and 3C designed by Zaha Hadid Architects and carrying DGNB Platinum sustainability certification. Practical constraints are the venue’s scale, its managed hall and dock schedule, and standard German technical rules on floor loading, power provisioning and rigging.

A vendor attending SPS, Hannover Messe and one or two regional automation events each year has a strong argument for a reusable modular or hybrid stand, since the savings compound across the calendar. Companies for whom SPS is the only major appearance may gain more brand value from a custom build. Hybrid suits automation well: a reusable structure carrying custom demonstration areas.

Nine to twelve months out, confirm space, agree the budget and brief the stand builder. Six months out, lock the design, confirm the true electrical and services load and book freight. Three months out, finalise graphics, demonstration content, staffing and hall logistics. During build-up week, install to the venue schedule and commission and test every live demonstration before doors.

A visitor stopping at a drive-systems stand often knows the category in depth and arrives with a specific technical question. A stand staffed only by sales or marketing people cannot hold that conversation and the visitor moves to a competitor who can. Bring application engineers, product specialists or systems people, supported by commercial staff handling qualification and follow-up.

Not by visitor count or badge scans. A drive manufacturer having twenty deep conversations with qualified machine builders has had a better fair than one scanning five hundred badges of students and passers-by. Measure engineering conversations entering the sales pipeline and the eventual value of those projects, capturing which technology, which application and what timeline.

ES About the authorExhibition Stands EU EditorialOur editors write practical planning guides for exhibitors at European trade fairs. We are independent of the builders we list, and Featured placements never influence what we publish.Read our editorial standards →
Was this guide helpful?

Next dates for the fairs in this guide

From the Exhibition Stands EU fair calendar.

IN PARTNERSHIP WITHCitePep

Noticed an error on this page? Correct it.

All guides take public correction through CitePep and the fixed version shows up here with credit to you and a permanent link to your contribution just like corrections already credited. Venue rules change and hall prices move so we would rather be corrected than be wrong and that keeps guides open to public correction.

Contribute on CitePep Free · takes about two minutes
  1. 01 Create a free account Takes a minute. You contribute under your own name.
  2. 02 File the correction Point at the claim and cite the source that shows it.
  3. 03 An editor reviews it If the source holds, the guide is amended and logged.
  4. 04 You are credited Your name and a permanent link appear on this page.

As an independent verification platform, CitePep works that way. The corrections that get filed are not controlled by Exhibition Stands EU and contributors receive credit under their own names.